Tuesday, May 6, 2014

Work Detail Update 5-3-14


Saturday, May 3, 2014 - Another great work detail was held on the SSRT, Black Bear Trailhead & surrounding roads. The Centre County Probation Office provided a few workers to help with the projects. George Holt led crew to  shovel, rake and seed topsoil at the Black Bear Trailhead. Jack Miller led a crew collecting trash and installing signs from Black Bear to Viaduct Bridge. Terry Long, Larry Mayes led another crew to paint the caution lines at the atv crossing on Casanova Road. Mark Watson led a 4th  group to collect trash from Avondale Bar to Black Bear Trailhead, from Casanova Nostalgia to Black Bear Trailhead & from Black Bear Bridge to Black Bear Trailhead. A pickup load of trash was collected from this area. That brings a total of 101/2 pickup loads of trash collected by the Snow Shoe Rails to Trails from the SSRT, Township Roads & State Roads in 2014. 

View photos from this event click here.

No comments:

Post a Comment